MID certificate Charging pile three phase energy meter
MID certificate Charging pile three phase energy meter
MID certificate Charging pile three phase energy meter
MID certificate Charging pile three phase energy meter
1 / 8
MID certificate Charging pile three phase energy meter
MID certificate Charging pile three phase energy meter
Home> Products> Energy Management Device> EV Charging Meter> MID certificate Charging pile three phase energy meter

MID certificate Charging pile three phase energy meter

Payment Type: L/C,D/P,D/A,T/T,MoneyGram
Incoterm: FOB,CFR,CIF,EXW
$66 ≥1
Set/Sets
$11,300.00   —  $5,600,000.00 /Set
Chat Now

Product Description

Product Attributes

Model No.ADL400

BrandAcrel

Place Of OriginChina

Display MethodAnalog And Digital

PhaseSingle Phase

Output Voltage230v

Place Of OriginJiangsu, China

Brand NameAcrel

Display TypeLcd With Backlit

Measuring Energy Range0-999999.9kwh

CommunicationRs485 Port Modbus-Rtu Protocol

CertificateCe Rohs Mid

Rated Current5(100)a/5(200)a/15(100)a/30(200)a

DisplayLcd Display

InstallationDin Rail Installation

ApplicationMulti Circuit

StandardIec62052-11/Iec62053-21

Model NumberAdl400

Accuracy ClassBetter Than Cl.1

Operating Temperature-25 ~+55

Dimensions72*87.8*71.5

TypeTime-Sharing Multi Tariff Measuring Meter

NameMID certificate Charging pile three phase energy meter

Product Namedigital energy meter

Supply Ability & Additional Information

Packagingcarton package

Productivity10000 Pcs/Month

TransportationOcean,Land,Air,Express

Place of OriginJiangsu,China

Supply Ability50000000 Set/Sets per Year

CertificateCE,IEC,ROHS

HS Code9030319000

PortShang Hai port

Payment TypeL/C,D/P,D/A,T/T,MoneyGram

IncotermFOB,CFR,CIF,EXW

Packaging & Delivery

Selling Units:
Set/Sets
Package Type:
carton package
Picture Example:

Product Description

Energy calculation time-sharing multi tariff measuring meter

Energy calculation time-sharing multi tariff measuring meter is a smart meter designed for power supply system, industrial and mining enterprises and utilities to calculate the electricity consumption and manage the electric demand. electronic energy meter Meterfeatures the high precision, small size and simple installation. time-sharing multi tariff measuring meter integrates the measurement of all electrical parameters with the comprehensive electricity metering and management provides various data on previous 48 months, checks the 31st harmonic content and the total harmonic content, realizes the remote communication and the remote control with switching input and relay output and boasts the alarm output. subentry measure dedicated energy meter is fitted with RS485 communication port and adapted to MODBUS-RTU .Accuracy 0.5S Energy Meter can be used in all kinds of control systems, SCADA systems and energy management systems. The meter meet the related technical requirements of electronic meter in the IEC62053-21standards.

Specification
Multifunction Electronic Energy Meters
Dimensions
digital energy meterelectronic energy meterlcd display energy meter

Note:The torque of direct connect should not be greater than 4.0N·m,and the torque of connect via CT should not be greater than 2.0N·m。
Wiring
smart energy meter
Packing & Delivery
multi tariff energy meter
Company Profile
3p4w din rail energy meter
Acrel Electric Co., Ltd. [Stock Code: 300286.SZ]
Founded in 2003, one of the few leading companies in China who provides various systematic solutions of power monitoring, power control, energy management and electrical safety for smart grid users. Substation automation system, Power Quality management system, energy management system, electrical fire monitoring system, IT distribution system for medical locations, precise distribution management system, FEPS power supply monitoring system, fire emergency lighting and evacuate indicating system, smart lighting control system and electric vehicle charging system.
FAQ

Q: Are you trading company or manufacturer ?


A: We are factory. Warmly welcome you to visit and investigate our factory.


Q: How long is your delivery time?


A: Generally it is 3-10 days if the goods are in stock. or it is 10-20 days if the goods are not in stock, it is according to quantity.


Q: Do you provide samples ? is it free or extra ?


A: Yes, we could offer the sample for lower price. If you place the order, all or part of the sample charge will be deducted from the goods. Please contact us.


Q: What is your terms of payment ?


A: Usually, 100%TT in advance. If you have projects for another payment terms, please feel free to contact us as below:


Hot Products

Home> Products> Energy Management Device> EV Charging Meter> MID certificate Charging pile three phase energy meter
Send Inquiry
*
*

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send